Update 6-5 Resurfacing project
- Posted On June 05, 2017
- By Chris Ziegler
- In Featured
- 0
*IMPORTANT NOTICE*
“Tentative” Butler-Freeport Trail Repaving Schedule
(per Brad Jeannerat with JC Lee Construction as of 6/2/17)
JC Lee Construction will be closing the Butler-Freeport Trail from Sheetz Drive to Marwood Road on Monday, June 5th, 2017 – Friday, June 9th, 2017 (weather permitting)
for the trail repaving project.
The “TRAIL CLOSED” signs will be posted at Sheetz Drive, Great Belt Road,
Jones Road, Keasey Road and Marwood Road.
**FOR YOUR SAFETY PLEASE “DO NOT BIKE OR WALK” ON THE TRAIL DURING THE TRAIL REPAVING PROJECT**