Trail Update 8-18-17
- Posted On August 18, 2017
- By Chris Ziegler
- In Featured
- 0
Long story short…Laneville to Monroe (4 miles) OPEN. Monroe to Bear Creek (1 mile) CLOSED (emergency DEP permit needed for stream stabilization). Bear Creek to Butler (15 miles) OPEN. Suggestion due to limited parking at Bear Creek park at Sarver, bike, walk, run to Bear Creek turn around and head north, this section is beautiful, don’t skip it). Ruts from Marwood to Herman were graded off, crossing fingers after this rain they held. Will report later today. ENJOY!
Update 8-10-17
- Posted On August 12, 2017
- By Chris Ziegler
- In Featured
- 0
(per Brad Jeannerat with JC Lee Construction/John Haven, Chairman of the Buffalo Township Board of Supervisors as of 8/10/17)
TRAIL PROJECT UPDATE
**Effective 8/10/17**
Freeport to Monroe Road
“OPEN”
————————————————————–
Monroe Road to
Bear Creek Road
“CLOSED”
**UNTIL FURTHER NOTICE – DO NOT ENTER**
————————————————————-
Bear Creek Road to Butler
“OPEN”
**USE CAUTION IN AREAS FROM MARWOOD ROAD TO HERMAN ROAD**
Update 8-9 Trail construction
- Posted On August 10, 2017
- By Chris Ziegler
- In Featured
- 0
Update per Supervisors meeting (8-9). Weather permitting construction will be complete by weeks end and the trail will be opened from the parking lot in Sarver to Bear Creek Rd. Bear Creek to Monroe will continue to be closed. A section of trail has collapsed into the Creek. An emergency permit is needed from DEP to do the repair. PLEASE stay away this is a very unstable situation. Monroe to Laneville is open and will remain so. Holbein Inc has been hired to fix the washout at the power line and two other areas of concern between Keasey and Herman. They will also be planing the edges to speed up the feathering of the cuts.
Update resurfacing 8-4
- Posted On August 04, 2017
- By Chris Ziegler
- In Featured
- 0
(per Brad Jeannerat with JC Lee Construction/John Haven, Chairman of the Buffalo Township Board of Supervisors as of 8/4/17)
TRAIL PROJECT UPDATE
**August 4, 2017**
TRAIL OPEN LANEVILLE TO BUTLER
8/5 and 8/6
**USE CAUTION IN AREAS FROM
MARWOOD ROAD TO HERMAN ROAD**
————————————————————————————————————
TRAIL “OPEN TEMPORARILY” FOR THE WEEKEND ONLY – FROM BEAR CREEK ROAD TO SARVER ROAD
**SOME PORTIONS HAVE NOT BEEN RESURFACED YET SO PLEASE BE CAREFUL**
————————————————————————————————————–
MONDAY 8/7/17
BEAR CREEK ROAD TO SARVER ROAD
“CLOSED FOR CONSTRUCTION”
DO NOT ENTER
**Please keep checking the Buffalo Township website for additional information/updates**
Update August 1st
- Posted On August 01, 2017
- By Chris Ziegler
- In Featured
- 0
(per Brad Jeannerat with JC Lee Construction/John Haven, Chairman of the Buffalo Township Board of Supervisors as of 7/31/17)
TRAIL PROJECT UPDATE
**July 31, 2017**
LANEVILLE TO MONROE ROAD
IS NOW OPEN
JC LEE CREWS INSTALLING FENCE & REPAIRING STORM DAMANGED AREAS – WATCH FOR SMALL CONSTRUCTION VEHICLES ON THIS SECTION
————————————————————–
MONROE ROAD TO SARVER ROAD
CLOSED
DO NOT ENTER
UNDER CONSTRUCTION: GRADING, EXCAVATING & DITCHING