Construction update 6-15-17
- Posted On June 15, 2017
- By Chris Ziegler
- In Featured
- 0
Trail is open. JC Lee is done resurfacing from Herman to Marwood, they still have to re-installing the gate and go through final inspection next Friday. Please do not use Sheetz Dr Trailhead as the still need to hauling equipment and material out. moving in to Laneville Monday. Starting then and for about a month Laneville to under the 28 bridge will be closed during the day. Open nights and weekends. Please mind the signs, this will go faster and be safer for everyone if folks stay away during the day.